42-371-39701

INJECTION [SWD] Water

KARAH SWD

PECOS County · District 8 · WATERBRIDGE TEXAS OPERATING LLC · ROJO CABALLOS (DELAWARE)

RRC Lookup

Permits

2

Max Depth

8,000 ft

First Permit

2018-03-05

Latest Activity

2018-12-31

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2019-03-14

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: WATERBRIDGE TEXAS OPERATING LLC ≠ Permit: HALCON OPERATING CO., INC.

Resolved via: schedulingWATERBRIDGE TEXAS OPERATING LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2019-03

Last Production

2026-03

Operator History

originally filed by HALCON OPERATING CO., INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#837057 A HALCON OPERATING CO., INC.
received 2018-11-13
#837057 A HALCON OPERATING CO., INC.
received 2018-03-02
Lat 31.024426
Lon -103.200619

Well Details

Well Number
1
Max Depth
8,000 ft
Drill Type
Vertical
County
PECOS
District
8
Completed
2019-03-14

Operator

Location
HOUSTON
P-5 Status
Y (filed 2025-04-04)
Cum Oil (all leases)
12,896 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/G, OPRS/O
Total Permits
20

External Links

Live © 2026 Petrora