42-373-30617
Final CompletionCARTER W. T. A
POLK County · District 3 · JACOBI-JOHNSON ENERGY INC. · SEGNO N.E. (WILCOX A)
Permits
1
Max Depth
8,200 ft
First Permit
1985-04-16
Latest Activity
1985-04-16
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-06-01
Shut-In
—
Plugged
1991-05-06
!
EWA / Permit operator mismatch
Scheduling: JACOBI-JOHNSON ENERGY INC. ≠ Permit: WOOLF & MAGEE, INC.
Resolved via: scheduling → JACOBI-JOHNSON ENERGY INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1998-01
Operator History
originally filed by WOOLF & MAGEE, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#272616 A WOOLF & MAGEE, INC.
received 1985-04-15
Well Details
- Well Number
- 3
- Max Depth
- 8,200 ft
- Drill Type
- Vertical
- County
- POLK
- District
- 3
- Operator
- JACOBI-JOHNSON ENERGY INC.
- Completed
- 1985-06-01
Operator
- Location
- TYLER
- P-5 Status
- Y (filed 1999-07-02)
- Cum Oil (all leases)
- 342,174 bbl
- Cum Gas (all leases)
- 855,017 mcf
- Total Permits
- 10