42-383-31768

Final Completion

UNIVERSITY-6

REAGAN County · District 7 · SMITH PIPE OF ABILENE · SPRABERRY (TREND AREA)

RRC Lookup

Permits

1

Max Depth

7,400 ft

First Permit

1980-10-21

Latest Activity

1980-10-21

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-03-13

Shut-In

Plugged

1998-11-10

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: ARKLAND PRODUCING CO., INC. (reported 1998-03)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: MWJ PRODUCING COMPANY

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1999-05

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#96196 A MWJ PRODUCING COMPANY
received 1980-10-21

Well Details

Well Number
1
Max Depth
7,400 ft
Drill Type
Vertical
County
REAGAN
District
7
Completed
1981-03-13

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora