42-387-30227

U

FORD J. K.

RED RIVER County · District 5 · TECHNOLOGY & ENGR. CAREERS INC. · SHELTON (COTTON VALLEY)

RRC Lookup

Permits

2

Max Depth

5,800 ft

First Permit

1980-02-05

Latest Activity

1992-06-18

Lifespan

12 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1992-09-17

Shut-In

Plugged

2014-08-14

!

EWA / Permit operator mismatch

Scheduling: TECHNOLOGY & ENGR. CAREERS INC. ≠ Permit: J B ENERGY, INC.

Resolved via: schedulingTECHNOLOGY & ENGR. CAREERS INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2017-12

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#400330 A J B ENERGY, INC.
received 1992-06-18
#71782 A POWER FUEL PRODUCERS, INC.
received 1980-02-05

Well Details

Well Number
2
Max Depth
5,800 ft
Drill Type
Vertical
County
RED RIVER
District
5
Completed
1992-09-17

Operator

Location
HOUSTON
P-5 Status
Y (filed 2018-04-06)
Cum Oil (all leases)
13,533 bbl
Cum Gas (all leases)
— mcf
Total Permits
2

External Links

Live © 2026 Petrora