42-391-32967

Final Completion

VIDAURI E

REFUGIO County · District 2 · CHARRO OPERATING L.L.C. · PHIL POWER (5100)

RRC Lookup

Permits

1

Max Depth

6,200 ft

First Permit

2010-08-04

Latest Activity

2010-08-04

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2010-08-28

Shut-In

Plugged

2011-06-08

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2010-08

Last Production

2011-06

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#700136 A CHARRO OPERATING, L.L.C.
received 2010-08-03

Well Details

Well Number
44
Max Depth
6,200 ft
Drill Type
Vertical
County
REFUGIO
District
2
Completed
2010-08-28

Operator

Location
ENGLEWOOD
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
1,800,277 bbl
Cum Gas (all leases)
90,890,968 mcf
Activities
G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
326

External Links

Live © 2026 Petrora