42-393-30664

FLOWERS -A-

ROBERTS County · District 10 · TECOLOTE ENERGY OPERATING LLC · MENDOTA NW. (MORROW LOWER)

RRC Lookup

Permits

2

Max Depth

13,000 ft

First Permit

1978-11-01

Latest Activity

1978-11-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-02-10

Shut-In

Plugged

2018-08-31

!

EWA / Production operator mismatch

Scheduling: TECOLOTE ENERGY OPERATING LLC ≠ Production: DEVON ENERGY PRODUCTION CO, L.P. (reported 2012-12)

!

EWA / Permit operator mismatch

Scheduling: TECOLOTE ENERGY OPERATING LLC ≠ Permit: AMARILLO OIL CO.

Resolved via: schedulingTECOLOTE ENERGY OPERATING LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2018-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#36722 A AMARILLO OIL CO.
received 1978-11-03
#35986 A AMARILLO OIL CO.
received 1978-11-01

Well Details

Well Number
1-4R
Max Depth
13,000 ft
Drill Type
Vertical
County
ROBERTS
District
10
Completed
1979-02-10

Operator

Location
FORT WORTH
P-5 Status
Y (filed 2021-10-08)
Cum Oil (all leases)
773,960 bbl
Cum Gas (all leases)
125,279,650 mcf
Total Permits
70

External Links

Live © 2026 Petrora