42-393-30905

Final Completion

LOWE

ROBERTS County · District 10 · CABOT PETROLEUM CORPORATION · LEDRICK RANCH S. (MORROW UP.)

RRC Lookup

Permits

1

Max Depth

10,000 ft

First Permit

1982-01-22

Latest Activity

1982-01-22

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-04-07

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: CABOT PETROLEUM CORPORATION ≠ Production: WILL ENERGY CORPORATION (reported 2019-01)

Resolved via: schedulingCABOT PETROLEUM CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#148234 A CABOT PETROLEUM CORPORATION
received 1982-01-22

Well Details

Well Number
50-A
Max Depth
10,000 ft
Drill Type
Vertical
County
ROBERTS
District
10
Completed
1982-04-07

Operator

Location
OKLAHOMA CI, TY
P-5 Status
Y (filed 1991-08-15)
Total Permits
118

External Links

Live © 2026 Petrora