42-395-31658

PRODUCING

PERRY GAS UNIT

ROBERTSON County · District 5 · HILCORP ENERGY COMPANY · OLETHA SW. (RODESSA)

RRC Lookup

Permits

3

Max Depth

14,000 ft

First Permit

2009-05-27

Latest Activity

2024-07-12

Lifespan

15 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

2024-07-26

Shut-In

Plugged

P-5 Org Status: Active

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2010-03

Last Production

2026-03

Operator History

Chain of Custody

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#901047 A HILCORP ENERGY COMPANY
received 2024-07-03
#705574 A XTO ENERGY INC.
received 2010-11-17
#681506 A XTO ENERGY INC.
received 2009-05-22
Lat 30.999647
Lon -96.624531

Well Details

Well Number
2
Max Depth
14,000 ft
Drill Type
Vertical
County
ROBERTSON
District
5
Completed
2024-07-26

Operator

Location
HOUSTON
P-5 Status
Y (filed 2025-01-13)
Cum Oil (all leases)
72,015,602 bbl
Cum Gas (all leases)
1,737,102,151 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
3,390

External Links

Live © 2026 Petrora