42-399-31483

Final Completion

MCWILLIAMS DORA

RUNNELS County · District 7 · PINON PETROLEUM INC. · MOTLEY NORTH (PALO PINTO)

RRC Lookup

Permits

1

Max Depth

4,730 ft

First Permit

1979-12-18

Latest Activity

1979-12-18

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-03-24

Shut-In

Plugged

1995-02-15

!

EWA / Permit operator mismatch

Scheduling: PINON PETROLEUM INC. ≠ Permit: ENRICH OIL CORPORATION

Resolved via: schedulingPINON PETROLEUM INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1995-04

Operator History

originally filed by ENRICH OIL CORPORATION — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#67117 A ENRICH OIL CORPORATION
received 1979-12-18

Well Details

Well Number
1
Max Depth
4,730 ft
Drill Type
Vertical
County
RUNNELS
District
7
Completed
1980-03-24

Operator

Location
SAN ANGELO
P-5 Status
Y (filed 2006-01-06)
Cum Oil (all leases)
32,263 bbl
Cum Gas (all leases)
10,122 mcf
Total Permits
14

External Links

Live © 2026 Petrora