42-399-31640

Final Completion

COLEMAN ET AL UNIT

RUNNELS County · District 7 · J-B PRODUCTION CO. · URBAN (MILES)

RRC Lookup

Permits

1

Max Depth

5,000 ft

First Permit

1980-06-03

Latest Activity

1980-06-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-06-25

Shut-In

Plugged

1984-09-17

Permit Applications (1)

#82806 A J-B PRODUCTION CO.
received 1980-06-03

Well Details

Well Number
1
Max Depth
5,000 ft
Drill Type
Vertical
County
RUNNELS
District
7
Completed
1980-06-25

Operator

Location
DENTON
P-5 Status
Y (filed 1994-04-02)
Cum Oil (all leases)
3 bbl
Cum Gas (all leases)
636 mcf
Total Permits
34

External Links

Live © 2026 Petrora