42-399-31923

Final Completion

BACA

RUNNELS County · District 7 · J-B PRODUCTION CO. · D-H-B (PALO PINTO)

RRC Lookup

Permits

1

Max Depth

5,000 ft

First Permit

1981-02-18

Latest Activity

1981-02-18

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-03-27

Shut-In

Plugged

1991-03-12

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#108793 A J-B PRODUCTION CO.
received 1981-02-18

Well Details

Well Number
1
Max Depth
5,000 ft
Drill Type
Vertical
County
RUNNELS
District
7
Completed
1981-03-27

Operator

Location
DENTON
P-5 Status
Y (filed 1994-04-02)
Cum Oil (all leases)
3 bbl
Cum Gas (all leases)
636 mcf
Total Permits
34

External Links

Live © 2026 Petrora