42-399-32084

Final Completion

BEARCAT

RUNNELS County · District 7 · HORIZON WELL SERVICES INC. · BEAR CAT (GARDNER LIME)

RRC Lookup

Permits

1

Max Depth

4,300 ft

First Permit

1981-07-27

Latest Activity

1981-07-27

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-09-25

Shut-In

Plugged

1994-02-14

!

EWA / Permit operator mismatch

Scheduling: HORIZON WELL SERVICES INC. ≠ Permit: SEAGO OIL, INC.

Resolved via: schedulingHORIZON WELL SERVICES INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1994-05

Operator History

originally filed by SEAGO OIL, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#126987 A SEAGO OIL, INC.
received 1981-07-27

Well Details

Well Number
1
Max Depth
4,300 ft
Drill Type
Vertical
County
RUNNELS
District
7
Completed
1981-09-25

Operator

Location
ABILENE
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
30,796 bbl
Cum Gas (all leases)
28,053 mcf
Activities
OPRS/G
Total Permits
11

External Links

Live © 2026 Petrora