42-399-33102
Final CompletionSCHAEFER ROY
RUNNELS County · District 7 · T. H. PRODUCTION COMPANY · LITTLE JIM (PALO PINTO)
Permits
1
Max Depth
4,400 ft
First Permit
1984-01-20
Latest Activity
1984-01-20
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-03-15
Shut-In
—
Plugged
1989-11-15
!
EWA / Permit operator mismatch
Scheduling: T. H. PRODUCTION COMPANY ≠ Permit: DYNAMIC PRODUCTION, INC.
Resolved via: scheduling → T. H. PRODUCTION COMPANY
Operator History
originally filed by DYNAMIC PRODUCTION, INC. — asset transferred
Permit History (1)
Permit Applications (1)
#227630 A DYNAMIC PRODUCTION, INC.
received 1983-12-28
Well Details
- Well Number
- 1
- Max Depth
- 4,400 ft
- Drill Type
- Vertical
- County
- RUNNELS
- District
- 7
- Operator
- T. H. PRODUCTION COMPANY
- Completed
- 1984-03-15
Operator
- Name
- T. H. PROD CO
- Location
- ABILENE
- P-5 Status
- Y (filed 1993-09-09)
- Total Permits
- 1