42-399-33164

Final Completion

WOOD

RUNNELS County · District 7 · DELTEX MINERALS INC. · KING (ELLENBURGER)

RRC Lookup

Permits

1

Max Depth

4,800 ft

First Permit

1984-03-07

Latest Activity

1984-03-07

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-04-13

Shut-In

Plugged

2007-12-29

!

EWA / Production operator mismatch

Scheduling: DELTEX MINERALS INC. ≠ Production: J.H. OIL, INC. (A) (reported 2001-04)

!

EWA / Permit operator mismatch

Scheduling: DELTEX MINERALS INC. ≠ Permit: J & R PETROLEUM INC

Resolved via: schedulingDELTEX MINERALS INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2008-06

Operator History

originally filed by J & R PETROLEUM INC — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#231709 A J & R PETROLEUM INC
received 1984-03-07

Well Details

Well Number
1
Max Depth
4,800 ft
Drill Type
Vertical
County
RUNNELS
District
7
Completed
1984-04-13

Operator

Location
PEACHTREE C, TY
P-5 Status
Y (filed 2015-12-04)
Cum Oil (all leases)
152,701 bbl
Cum Gas (all leases)
112,734 mcf
Total Permits
16

External Links

Live © 2026 Petrora