42-399-34166

INJECTION

BELK H. A.

RUNNELS County · District 7 · TRIFORCE ENERGY LLC · VOGELSANG (PALO PINTO)

RRC Lookup

Permits

1

Max Depth

4,450 ft

First Permit

1991-09-26

Latest Activity

1991-09-26

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2014-10-06

Shut-In

Plugged

P-5 Org Status: Delinquent

!

EWA / Permit operator mismatch

Scheduling: TRIFORCE ENERGY LLC ≠ Permit: ARCADIA OIL & GAS COMPANY, INC.

Resolved via: schedulingTRIFORCE ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by ARCADIA OIL & GAS COMPANY, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#392266 A ARCADIA OIL & GAS COMPANY, INC.
received 1991-09-26

Well Details

Well Number
3
Max Depth
4,450 ft
Drill Type
Vertical
County
RUNNELS
District
7
Completed
2014-10-06

Operator

Location
LITTLETON
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
1,331 bbl
Cum Gas (all leases)
1,881,646 mcf
Activities
OPRS/O

External Links

Live © 2026 Petrora