42-399-34249
Final CompletionPENDULUM
RUNNELS County · District 7 · CEDAR OIL COMPANY · FALSE ARROWHEAD (KING SAND)
Permits
1
Max Depth
4,600 ft
First Permit
1993-07-16
Latest Activity
1993-07-16
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1993-08-04
Shut-In
—
Plugged
2022-01-24
!
EWA / Production operator mismatch
Scheduling: CEDAR OIL COMPANY ≠ Production: HORIZON EXPLORATION SERVICES (reported 2009-03)
!
EWA / Permit operator mismatch
Scheduling: CEDAR OIL COMPANY ≠ Permit: MIDLAND OIL AND GAS, INC.
Resolved via: scheduling → CEDAR OIL COMPANY
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-08
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#413089 A MIDLAND OIL AND GAS, INC.
received 1993-06-23
Well Details
- Well Number
- 1
- Max Depth
- 4,600 ft
- Drill Type
- Vertical
- County
- RUNNELS
- District
- 7
- Operator
- CEDAR OIL COMPANY
- Completed
- 1993-08-04
Operator
- Name
- CEDAR OIL CO
- Location
- ABILENE
- P-5 Status
- Y (filed 2025-12-04)
- Cum Oil (all leases)
- 598,706 bbl
- Cum Gas (all leases)
- 343,580 mcf
- Activities
- OPRS/O
- Total Permits
- 75