42-399-34417

Final Completion

WALSH-WALLER

RUNNELS County · District 7 · BOAZ ENERGY II OPERATING LLC · BALLINGER WEST (MORRIS SD)

RRC Lookup

Permits

4

Max Depth

4,500 ft

First Permit

1995-12-21

Latest Activity

2007-05-21

Lifespan

11 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2007-05-22

Shut-In

Plugged

2018-07-23

!

EWA / Production operator mismatch

Scheduling: BOAZ ENERGY II OPERATING LLC ≠ Production: MEMORIAL PRODUCTION OPER. LLC (reported 2014-03)

!

EWA / Permit operator mismatch

Scheduling: BOAZ ENERGY II OPERATING LLC ≠ Permit: PANAMERICAN OPERATING INC

Resolved via: schedulingBOAZ ENERGY II OPERATING LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1996-02

Last Production

2023-02

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#639128 A PANAMERICAN OPERATING INC
received 2009-10-08
#639128 A PANAMERICAN OPERATING INC
received 2007-05-16
#492508 A WALSH RESOURCES, INC.
received 2000-02-28
#443102 A WALSH RESOURCES, INC.
received 1995-12-21

Well Details

Well Number
1
Max Depth
4,500 ft
Drill Type
Vertical
County
RUNNELS
District
7
Completed
2007-05-22

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-08-04)
Cum Oil (all leases)
5,822,205 bbl
Cum Gas (all leases)
800,574 mcf
Activities
OPRS/O
Total Permits
146

External Links

Live © 2026 Petrora