42-399-35460
Final CompletionAIRHART
RUNNELS County · District 7 · DEL MAR ENERGY INC. · WINTERS (PALO PINTO)
Permits
1
Max Depth
5,000 ft
First Permit
2014-12-22
Latest Activity
2014-12-22
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2015-05-02
Shut-In
—
Plugged
2018-05-22
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2015-05
Last Production
2019-12
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#802100 A DEL MAR ENERGY, INC.
received 2014-12-22
Well Details
- Well Number
- 1
- Max Depth
- 5,000 ft
- Drill Type
- Vertical
- County
- RUNNELS
- District
- 7
- Operator
- DEL MAR ENERGY INC.
- Completed
- 2015-05-02
Operator
- Name
- DEL MAR ENGY, INC
- Location
- VAN ALSTYNE
- P-5 Status
- Y (filed 2024-06-07)
- Cum Oil (all leases)
- 111,878 bbl
- Cum Gas (all leases)
- — mcf
- Activities
- OPRS/O
- Total Permits
- 66