42-399-35591

SHUT IN

SHIRLEY A

RUNNELS County · District 7 · CEDAR OIL COMPANY · FENNELL (GOEN)

RRC Lookup

Permits

2

Max Depth

4,999 ft

First Permit

2021-01-27

Latest Activity

2021-01-27

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2021-07-09

Shut-In

Plugged

P-5 Org Status: Delinquent

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2021-07

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#867265 A CEDAR OIL COMPANY
received 2021-03-23
#867265 A CEDAR OIL COMPANY
received 2021-01-22
Lat 31.971118
Lon -100.046448

Well Details

Well Number
2
Max Depth
4,999 ft
Drill Type
Vertical
County
RUNNELS
District
7
Completed
2021-07-09

Operator

Location
ABILENE
P-5 Status
Y (filed 2025-12-04)
Cum Oil (all leases)
598,706 bbl
Cum Gas (all leases)
343,580 mcf
Activities
OPRS/O
Total Permits
75

External Links

Live © 2026 Petrora