42-401-33720

Final Completion

THOMPSON PERRY GU

RUSK County · District 6 · VERADO ENERGY INC. · OAK HILL (COTTON VALLEY)

RRC Lookup

Permits

1

Max Depth

12,000 ft

First Permit

2005-10-25

Latest Activity

2005-10-25

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2006-02-17

Shut-In

Plugged

2019-06-24

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2006-02

Last Production

2019-06

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#608434 A VERADO ENERGY, INC.
received 2005-10-25

Well Details

Well Number
11
Max Depth
12,000 ft
Drill Type
Vertical
County
RUSK
District
6
Completed
2006-02-17

Operator

Location
ALLEN
P-5 Status
Y (filed 2024-12-06)
Cum Oil (all leases)
4,196,945 bbl
Cum Gas (all leases)
241,389,842 mcf
Total Permits
193

External Links

Live © 2026 Petrora