42-409-30324

Final Completion

WELDER J. F. UNIT

SAN PATRICIO County · District 4 · SMITH PRODUCTION INC. · ODEM (7000)

RRC Lookup

Permits

1

Max Depth

7,130 ft

First Permit

1997-10-03

Latest Activity

1997-10-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1973-09-23

Shut-In

Plugged

2020-06-11

!

EWA / Production operator mismatch

Scheduling: SMITH PRODUCTION INC. ≠ Production: SOUTHERN BAY OPERATING, L.L.C. (reported 2011-08)

Resolved via: schedulingSMITH PRODUCTION INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2020-11

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#468092 A SMITH PRODUCTION INC.
received 1997-09-26

Well Details

Well Number
19
Max Depth
7,130 ft
Drill Type
Vertical
District
4
Completed
1973-09-23

Operator

Location
THE WOODLAN, DS
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
1,470,582 bbl
Cum Gas (all leases)
312,196,652 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
433

External Links

Live © 2026 Petrora