42-409-32036
Final CompletionCHAPMAN W. M.
SAN PATRICIO County · District 4 · HAWKEYE ENERGY INC. (I) · HIBERNIA (4270)
Permits
2
Max Depth
5,950 ft
First Permit
1985-04-03
Latest Activity
1985-07-08
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-07-28
Shut-In
—
Plugged
1996-01-24
!
EWA / Permit operator mismatch
Scheduling: HAWKEYE ENERGY INC. (I) ≠ Permit: AMERICAN PETROFINA CO. OF TEX.
Resolved via: scheduling → HAWKEYE ENERGY INC. (I)
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1996-01
Operator History
originally filed by AMERICAN PETROFINA CO. OF TEX. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#279663 A AMERICAN PETROFINA CO. OF TEX.
received 1985-07-08
#271391 A AMERICAN PETROFINA CO. OF TEX.
received 1985-04-03
Well Details
- Well Number
- 6
- Max Depth
- 5,950 ft
- Drill Type
- Vertical
- County
- SAN PATRICIO
- District
- 4
- Operator
- HAWKEYE ENERGY INC. (I)
- Completed
- 1985-07-28
Operator
- Location
- PLANO
- P-5 Status
- Y (filed 1995-04-07)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf