42-409-32383

Final Completion

FISCHER NELLIE I. UNIT

SAN PATRICIO County · District 4 · HARRIS ENERGY SERVICES LLC · RIVERSIDE EAST (5750)

RRC Lookup

Permits

2

Max Depth

7,000 ft

First Permit

1991-10-25

Latest Activity

1993-08-16

Lifespan

2 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1993-08-17

Shut-In

Plugged

2023-12-21

!

EWA / Production operator mismatch

Scheduling: HARRIS ENERGY SERVICES LLC ≠ Production: MO-JON, INC. (reported 1997-03)

!

EWA / Permit operator mismatch

Scheduling: HARRIS ENERGY SERVICES LLC ≠ Permit: MO-JON, INC.

Resolved via: schedulingHARRIS ENERGY SERVICES LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by MO-JON, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Well Details

Well Number
1
Max Depth
7,000 ft
Drill Type
Vertical
District
4
Completed
1993-08-17

Operator

Location
DALLAS
P-5 Status
Y (filed 2025-06-04)
Cum Oil (all leases)
71,491 bbl
Cum Gas (all leases)
1,709,800 mcf
Activities
OPRS/G, OPRS/O
Total Permits
7

External Links

Live © 2026 Petrora