42-409-32518

Final Completion

HUTCHINSON

SAN PATRICIO County · District 4 · PEDECO INC. · MATHIS E (5600)

RRC Lookup

Permits

1

Max Depth

6,500 ft

First Permit

1997-03-25

Latest Activity

1997-03-25

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1997-05-09

Shut-In

Plugged

1999-10-05

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1997-05

Last Production

1999-10

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#460314 A PEDECO, INC.
received 1997-03-25

Well Details

Well Number
1
Max Depth
6,500 ft
Drill Type
Vertical
District
4
Operator
PEDECO INC.
Completed
1997-05-09

Operator

Location
CASPER
P-5 Status
Y (filed 2005-06-10)
Cum Oil (all leases)
641,487 bbl
Cum Gas (all leases)
2,169,623 mcf
Total Permits
170

External Links

Live © 2026 Petrora