42-413-30363

VALIS FRANK

SCHLEICHER County · District 7 · SMITH PIPE OF ABILENE · HENRY-SPECK (CANYON)

RRC Lookup

Permits

1

Max Depth

7,900 ft

First Permit

1977-06-21

Latest Activity

1977-06-21

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1977-08-17

Shut-In

Plugged

1999-10-12

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: THOMAS OIL AND GAS INC. (reported 1999-02)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: CADASCO, INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1999-10

Operator History

originally filed by CADASCO, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#1624 A CADASCO, INC.
received 1977-06-21

Well Details

Well Number
1
Max Depth
7,900 ft
Drill Type
Vertical
County
SCHLEICHER
District
7
Completed
1977-08-17

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora