42-413-31029
Final CompletionUNIVERSITY 11
SCHLEICHER County · District 7 · FORTUNE PRODUCTION CO. · UNIVERSITY 54 (ELLENBURGER)
Permits
1
Max Depth
8,200 ft
First Permit
1981-03-26
Latest Activity
1981-03-26
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1981-06-08
Shut-In
—
Plugged
—
!
EWA / Production operator mismatch
Scheduling: FORTUNE PRODUCTION CO. ≠ Production: FORTUNE ENERGY, INC. (reported 2025-12)
Resolved via: production → FORTUNE ENERGY, INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#113298 A FORTUNE PRODUCTION CO.
received 1981-03-26
Well Details
- Well Number
- 1
- Max Depth
- 8,200 ft
- Drill Type
- Vertical
- County
- SCHLEICHER
- District
- 7
- Operator
- FORTUNE PRODUCTION CO.
- Completed
- 1981-06-08
Operator
- Name
- FORTUNE PROD CO
- Location
- SAN ANGELO
- P-5 Status
- Y (filed 2010-01-08)
- Cum Oil (all leases)
- 758,585 bbl
- Cum Gas (all leases)
- 6,391,504 mcf
- Total Permits
- 153