42-413-31162
Final CompletionEMBAR -B-
SCHLEICHER County · District 7 · PHILLIPS PETROLEUM COMPANY · EMBAR (FUSSELMAN)
Permits
1
Max Depth
6,800 ft
First Permit
1981-12-03
Latest Activity
1981-12-03
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1982-01-28
Shut-In
—
Plugged
2010-08-26
!
EWA / Production operator mismatch
Scheduling: PHILLIPS PETROLEUM COMPANY ≠ Production: DISCOVERY OPERATING, INC. (reported 2004-12)
!
EWA / Permit operator mismatch
Scheduling: PHILLIPS PETROLEUM COMPANY ≠ Permit: ROYAL CREST PETROLEUM, INC.
Resolved via: scheduling → PHILLIPS PETROLEUM COMPANY
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2010-10
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#142478 A ROYAL CREST PETROLEUM, INC.
received 1981-12-03
Well Details
- Well Number
- 1
- Max Depth
- 6,800 ft
- Drill Type
- Vertical
- County
- SCHLEICHER
- District
- 7
- Operator
- PHILLIPS PETROLEUM COMPANY
- Completed
- 1982-01-28
Operator
- Name
- PHILLIPS PETRO CO
- Location
- HOUSTON
- P-5 Status
- Y (filed 2003-06-20)
- Cum Oil (all leases)
- 41,085,875 bbl
- Cum Gas (all leases)
- 1,158,849,972 mcf
- Total Permits
- 2,544