42-415-32380

SHUT IN

DUNN A ROBYN

SCURRY County · District 8 · THREE J S PETROLEUM INC. · ALLEN-HOLIDAY (PENN.)

RRC Lookup

Permits

1

Max Depth

7,900 ft

First Permit

1982-12-31

Latest Activity

1982-12-31

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

1984-03-29

Shut-In

Plugged

P-5 Org Status: X

!

EWA / Permit operator mismatch

Scheduling: THREE J S PETROLEUM INC. ≠ Permit: ALLEN & ALLEN

Resolved via: schedulingTHREE J S PETROLEUM INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#183280 A ALLEN & ALLEN
received 1984-05-08
#183280 A RKP, INC.
received 1982-12-31

Well Details

Well Number
1
Max Depth
7,900 ft
Drill Type
Vertical
County
SCURRY
District
8
Completed
1984-03-29

Operator

Location
LUBBOCK
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
56,241 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
2

External Links

Live © 2026 Petrora