42-415-81578

Final Completion

ALLEN T. P.

SCURRY County · District 8 · THREE J S PETROLEUM INC. · ALLEN-HOLIDAY (PENN.)

RRC Lookup

Permits

1

Max Depth

4,515 ft

First Permit

1980-10-07

Latest Activity

1980-10-07

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-04-14

Shut-In

Plugged

2023-08-29

!

EWA / Permit operator mismatch

Scheduling: THREE J S PETROLEUM INC. ≠ Permit: ALLEN, T. P.

Resolved via: schedulingTHREE J S PETROLEUM INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by ALLEN, T. P. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#94904 A ALLEN, T. P.
received 1980-10-07

Well Details

Well Number
A-1
Max Depth
4,515 ft
Drill Type
Vertical
County
SCURRY
District
8
Completed
1982-04-14

Operator

Location
LUBBOCK
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
56,241 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
2

External Links

Live © 2026 Petrora