42-417-01077

PRODUCING

WINDHAM J.

SHACKELFORD County · District 7 · DAHAB ENERGY INC. · BOB-J (TANNEHILL LIME)

RRC Lookup

Permits

2

Max Depth

3,954 ft

First Permit

1987-05-28

Latest Activity

1988-08-02

Lifespan

1 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

Shut-In

Plugged

P-5 Org Status: X

!

EWA / Permit operator mismatch

Scheduling: DAHAB ENERGY INC. ≠ Permit: KADANE OIL COMPANY

Resolved via: productionDAHAB ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

Chain of Custody

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#349534 A KADANE OIL COMPANY
received 1988-07-29
#330716 A KADANE OIL COMPANY
received 1987-05-26

Well Details

Well Number
2
Max Depth
3,954 ft
Drill Type
Vertical
District
7

Operator

Location
DALLAS
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
268,606 bbl
Cum Gas (all leases)
543,899 mcf
Activities
OPRS/G, OPRS/O
Total Permits
35

External Links

Live © 2026 Petrora