42-417-34785

Final Completion

WILLA GAIL

SHACKELFORD County · District 7 · IRON HORSE OIL & GAS INC. · LILLY (PALO PINTO LO.)

RRC Lookup

Permits

1

Max Depth

3,500 ft

First Permit

1982-10-05

Latest Activity

1982-10-05

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-10-15

Shut-In

Plugged

1996-02-23

!

EWA / Production operator mismatch

Scheduling: IRON HORSE OIL & GAS INC. ≠ Production: TELESIS OPERATING CO., INC. (reported 2006-11)

!

EWA / Permit operator mismatch

Scheduling: IRON HORSE OIL & GAS INC. ≠ Permit: HALIBURTON-MURDOCH PETROLEUM CO

Resolved via: schedulingIRON HORSE OIL & GAS INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#174623 A HALIBURTON-MURDOCH PETROLEUM CO
received 1982-10-05

Well Details

Well Number
1
Max Depth
3,500 ft
Drill Type
Vertical
District
7
Completed
1982-10-15

Operator

Location
ALBANY
P-5 Status
Y (filed 2026-03-04)
Cum Oil (all leases)
55,763 bbl
Cum Gas (all leases)
8,565 mcf
Activities
OPRS/G, OPRS/O
Total Permits
1

External Links

Live © 2026 Petrora