42-417-38507

Final Completion

DAVIS W. Y.

SHACKELFORD County · District 7 · SCHKADE PRODUCTION CO. · SHACKELFORD COUNTY REGULAR

RRC Lookup

Permits

1

Max Depth

2,000 ft

First Permit

2005-04-19

Latest Activity

2005-04-19

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2005-05-18

Shut-In

Plugged

2019-01-10

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2020-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#560614 A SCHKADE PRODUCTION CO.
received 2005-04-15

Well Details

Well Number
27
Max Depth
2,000 ft
Drill Type
Vertical
District
7
Completed
2005-05-18

Operator

Location
ABILENE
P-5 Status
Y (filed 2020-06-05)
Cum Oil (all leases)
98,232 bbl
Cum Gas (all leases)
118,225 mcf
Total Permits
1

External Links

Live © 2026 Petrora