42-419-30844

PRODUCING Horizontal

MCMAHON FEDERAL

SHELBY County · District 6 · ELLORA ENERGY INC. · HUXLEY (6100)

RRC Lookup

Permits

5

Max Depth

7,000 ft

First Permit

2003-02-07

Latest Activity

2008-09-11

Lifespan

6 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

2003-05-04

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: ELLORA ENERGY INC. ≠ Permit: ELLORA OPERATING, L.P.

Resolved via: productionELLORA ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2003-05

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (5)

#669688 A ELLORA OPERATING, L.P.
received 2008-08-22
#543047 A ELLORA OPERATING, L.P.
received 2004-03-10
#528265 A ELLORA OPERATING, L.P.
received 2003-06-13
#528265 A ELLORA OPERATING, L.P.
received 2003-04-07
#528265 A ELLORA OPERATING, L.P.
received 2003-02-07

Well Details

Well Number
1H
Max Depth
7,000 ft
Drill Type
Horizontal
County
SHELBY
District
6
Completed
2003-05-04

Operator

Location
Y SPRING
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
6,605 bbl
Cum Gas (all leases)
34,384,753 mcf
Activities
OPRS/G, OPRS/O
Total Permits
1

External Links

Live © 2026 Petrora