42-419-31140
PRODUCING HorizontalDirectionalPALMER UNIT
SHELBY County · District 6 · SHERIDAN PRODUCTION CO III LLC · OLIVER CREEK (TRAVIS PEAK)
Permits
6
Max Depth
16,000 ft
First Permit
2007-03-12
Latest Activity
2014-09-16
Lifespan
8 yrs
Regulatory Status
Schedule
ON SCHEDULE
Completion
2014-11-22
Shut-In
—
Plugged
—
P-5 Org Status: Active
EWA / Permit operator mismatch
Scheduling: SHERIDAN PRODUCTION CO III LLC ≠ Permit: DEVON ENERGY PRODUCTION CO, L.P.
Resolved via: production → SHERIDAN PRODUCTION CO III, LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2009-04
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (6)
PALMER UNIT · 12,345 ft
2014-09-16
Spud 2014-10-22
PALMER UNIT · 16,000 ft
2009-03-19
Spud 2008-12-21
PALMER UNIT · 12,000 ft
2007-03-12
PALMER UNIT · 16,000 ft
2007-03-12
Spud 2008-12-21
PALMER UNIT · 15,000 ft
2007-03-12
PALMER UNIT · 15,000 ft
2007-03-12
Permit Applications (6)
Well Details
- Well Number
- 1
- Max Depth
- 16,000 ft
- Drill Type
- Horizontal, Directional
- County
- SHELBY
- District
- 6
- Operator
- SHERIDAN PRODUCTION CO III LLC
- Completed
- 2014-11-22
Operator
- Location
- HOUSTON
- P-5 Status
- Y (filed 2025-06-04)
- Cum Oil (all leases)
- 456,482 bbl
- Cum Gas (all leases)
- 172,697,741 mcf
- Activities
- CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
- Total Permits
- 97