42-423-30751
TEMP ABANDONEDMCMOYLE UNIT 1
SMITH County · District 6 · FAULCONER ENERGY LLC · OVERTON (COTTON VALLEY SAND)
Permits
2
Max Depth
12,600 ft
First Permit
1984-02-13
Latest Activity
1984-05-07
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
1984-04-16
Shut-In
—
Plugged
—
P-5 Org Status: Active
!
EWA / Production operator mismatch
Scheduling: FAULCONER ENERGY LLC ≠ Production: FAULCONER, VERNON E., INC. (reported 2020-06)
!
EWA / Permit operator mismatch
Scheduling: FAULCONER ENERGY LLC ≠ Permit: TXO PRODUCTION CORP.
Resolved via: scheduling → FAULCONER ENERGY LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
MARATHON OIL COMPANY 1993-1996→ UNION PACIFIC RESOURCES COMPANY 1996-1997→ MAP PRODUCTION CO., INC. 1998-2007→ ENSIGHT III ENERGY MGMT, LLC 2007-2008→ FOREST OIL CORPORATION 2008-2015→ SABINE OIL & GAS CORPORATION 2015-2018→ LINN OPERATING, LLC 2018-2019→ RIVIERA OPERATING, LLC 2019-2020→ FAULCONER, VERNON E., INC. 2020-2020
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#238200 A TXO PRODUCTION CORP.
received 1984-05-07
#230914 A TXO PRODUCTION CORP.
received 1983-11-17
Well Details
- Well Number
- 1
- Max Depth
- 12,600 ft
- Drill Type
- Vertical
- County
- SMITH
- District
- 6
- Operator
- FAULCONER ENERGY LLC
- Completed
- 1984-04-16
Operator
- Name
- FAULCONER ENGY, LLC
- Location
- TYLER
- P-5 Status
- Y (filed 2025-09-04)
- Cum Oil (all leases)
- 344,817 bbl
- Cum Gas (all leases)
- 64,700,023 mcf
- Activities
- CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
- Total Permits
- 37