42-423-30804

Final Completion

PHILLIPS G. R.

SMITH County · District 6 · ELAND ENERGY INC. · CHAPEL HILL NE. (TRAVIS PEAK)

RRC Lookup

Permits

1

Max Depth

8,700 ft

First Permit

1984-04-16

Latest Activity

1984-04-16

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-08-14

Shut-In

Plugged

1992-03-12

!

EWA / Permit operator mismatch

Scheduling: ELAND ENERGY INC. ≠ Permit: CIBOLA OIL & GAS CORP.

Resolved via: schedulingELAND ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2008-03

Operator History

originally filed by CIBOLA OIL & GAS CORP. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#235621 A CIBOLA OIL & GAS CORP.
received 1984-10-12
#235621 A CIBOLA OIL & GAS CORP.
received 1984-03-14

Well Details

Well Number
1
Max Depth
8,700 ft
Drill Type
Vertical
County
SMITH
District
6
Completed
1984-08-14

Operator

Location
DALLAS
P-5 Status
Y (filed 2021-12-10)
Cum Oil (all leases)
2,811,241 bbl
Cum Gas (all leases)
24,710,183 mcf
Total Permits
55

External Links

Live © 2026 Petrora