42-423-31026

Final Completion

CAUDLE A. R.

SMITH County · District 6 · SPELLER OIL CORPORATION · CHAPEL HILL (TRAVIS PEAK)

RRC Lookup

Permits

1

Max Depth

8,700 ft

First Permit

1985-08-19

Latest Activity

1985-08-19

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1986-01-16

Shut-In

Plugged

2007-08-16

!

EWA / Permit operator mismatch

Scheduling: SPELLER OIL CORPORATION ≠ Permit: SOCO RESOURCES

Resolved via: schedulingSPELLER OIL CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2007-12

Operator History

originally filed by SOCO RESOURCES — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#282705 A SOCO RESOURCES
received 1985-08-07

Well Details

Well Number
1
Max Depth
8,700 ft
Drill Type
Vertical
County
SMITH
District
6
Completed
1986-01-16

Operator

Location
OKLAHOMA CI, TY
P-5 Status
Y (filed 2018-04-06)
Cum Oil (all leases)
21,604 bbl
Cum Gas (all leases)
— mcf
Total Permits
4

External Links

Live © 2026 Petrora