42-423-31692
Final CompletionJERRY CROSS OIL UNIT
SMITH County · District 6 · FAULCONER ENERGY LLC · MAP BOYS (RODESSA)
Permits
2
Max Depth
12,200 ft
First Permit
2003-10-03
Latest Activity
2010-10-22
Lifespan
7 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2010-12-18
Shut-In
—
Plugged
2021-12-08
!
EWA / Production operator mismatch
Scheduling: FAULCONER ENERGY LLC ≠ Production: LINN OPERATING, INC. (reported 2013-03)
!
EWA / Permit operator mismatch
Scheduling: FAULCONER ENERGY LLC ≠ Permit: SOUTHWESTERN ENERGY PROD. CO.
Resolved via: scheduling → FAULCONER ENERGY LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2003-12
Last Production
2021-12
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#704044 A SOUTHWESTERN ENERGY PROD. CO.
received 2010-10-20
#537119 A SOUTHWESTERN ENERGY PROD. CO.
received 2003-10-03
Well Details
- Well Number
- 4RC
- Max Depth
- 12,200 ft
- Drill Type
- Vertical
- County
- SMITH
- District
- 6
- Operator
- FAULCONER ENERGY LLC
- Completed
- 2010-12-18
Operator
- Name
- FAULCONER ENGY, LLC
- Location
- TYLER
- P-5 Status
- Y (filed 2025-09-04)
- Cum Oil (all leases)
- 344,817 bbl
- Cum Gas (all leases)
- 64,700,023 mcf
- Activities
- CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
- Total Permits
- 37