42-423-31692

Final Completion

JERRY CROSS OIL UNIT

SMITH County · District 6 · FAULCONER ENERGY LLC · MAP BOYS (RODESSA)

RRC Lookup

Permits

2

Max Depth

12,200 ft

First Permit

2003-10-03

Latest Activity

2010-10-22

Lifespan

7 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2010-12-18

Shut-In

Plugged

2021-12-08

!

EWA / Production operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Production: LINN OPERATING, INC. (reported 2013-03)

!

EWA / Permit operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Permit: SOUTHWESTERN ENERGY PROD. CO.

Resolved via: schedulingFAULCONER ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2003-12

Last Production

2021-12

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#704044 A SOUTHWESTERN ENERGY PROD. CO.
received 2010-10-20
#537119 A SOUTHWESTERN ENERGY PROD. CO.
received 2003-10-03

Well Details

Well Number
4RC
Max Depth
12,200 ft
Drill Type
Vertical
County
SMITH
District
6
Completed
2010-12-18

Operator

Location
TYLER
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
344,817 bbl
Cum Gas (all leases)
64,700,023 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
37

External Links

Live © 2026 Petrora