42-423-31965
Final CompletionWILLIAMS
SMITH County · District 6 · J-W OPERATING CO. · CHAPEL HILL (COTTON VALLEY)
Permits
1
Max Depth
13,000 ft
First Permit
2005-06-03
Latest Activity
2005-06-03
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2012-02-27
Shut-In
—
Plugged
2018-03-29
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2005-08
Last Production
2018-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#601541 A J-W OPERATING CO.
received 2005-06-02
Well Details
- Well Number
- 1
- Max Depth
- 13,000 ft
- Drill Type
- Vertical
- County
- SMITH
- District
- 6
- Operator
- J-W OPERATING CO.
- Completed
- 2012-02-27
Operator
- Name
- J-W OPER CO
- Location
- ADDISON
- P-5 Status
- Y (filed 2025-04-04)
- Cum Oil (all leases)
- 936,249 bbl
- Cum Gas (all leases)
- 214,774,088 mcf
- Activities
- OPRS/G
- Total Permits
- 350