42-427-33657

Final Completion

SAMANO

STARR County · District 4 · SMITH PRODUCTION INC. · SAMANO (THIRD MASSIVE)

RRC Lookup

Permits

2

Max Depth

10,500 ft

First Permit

2003-09-12

Latest Activity

2009-01-30

Lifespan

5 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2003-10-29

Shut-In

Plugged

2022-03-10

!

EWA / Production operator mismatch

Scheduling: SMITH PRODUCTION INC. ≠ Production: EL PASO E & P COMPANY, L. P. (reported 2007-10)

Resolved via: schedulingSMITH PRODUCTION INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2003-10

Last Production

2022-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#677819 A SMITH PRODUCTION INC.
received 2009-01-26
#536357 A EL PASO PRODUCTION OIL & GAS CO.
received 2003-09-12

Well Details

Well Number
44
Max Depth
10,500 ft
Drill Type
Vertical
County
STARR
District
4
Completed
2003-10-29

Operator

Location
THE WOODLAN, DS
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
1,470,582 bbl
Cum Gas (all leases)
312,196,652 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
433

External Links

Live © 2026 Petrora