42-429-04898
COOPER O. R. JR.
STEPHENS County · District 7 · TEXAS PACIFIC OIL COMPANY INC. · WALKER-DAVIS (MARBLE FALLS)
Permits
1
Max Depth
4,500 ft
First Permit
1978-05-24
Latest Activity
1978-05-24
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
1971-06-01
!
EWA / Production operator mismatch
Scheduling: TEXAS PACIFIC OIL COMPANY INC. ≠ Production: T-N-T ENGINEERING, INC. (reported 2012-08)
!
EWA / Permit operator mismatch
Scheduling: TEXAS PACIFIC OIL COMPANY INC. ≠ Permit: BRENNAN ENERGY, INC.
Resolved via: scheduling → TEXAS PACIFIC OIL COMPANY INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2013-06
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#25075 A BRENNAN ENERGY, INC.
received 1978-05-24
Well Details
- Well Number
- 1
- Max Depth
- 4,500 ft
- Drill Type
- Vertical
- County
- STEPHENS
- District
- 7
- Operator
- TEXAS PACIFIC OIL COMPANY INC.
Operator
- Location
- DALLAS
- P-5 Status
- Y (filed 1982-09-15)
- Total Permits
- 589