42-429-34417

Final Completion

COPELAND RANCH

STEPHENS County · District 7 · SMITH PIPE OF ABILENE · MICAR (BEND CONGL. 3727)

RRC Lookup

Permits

1

Max Depth

4,950 ft

First Permit

1985-03-19

Latest Activity

1985-03-19

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

1997-07-16

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: NEELEY, JUNE (reported 1996-01)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: MIDCENTRAL ENERGY CORPORATION

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1997-07

Operator History

originally filed by MIDCENTRAL ENERGY CORPORATION — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#269890 A MIDCENTRAL ENERGY CORPORATION
received 1985-03-19

Well Details

Well Number
51
Max Depth
4,950 ft
Drill Type
Vertical
County
STEPHENS
District
7

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora