42-429-35138

Final Completion

COPELAND RANCH

STEPHENS County · District 7 · SMITH PIPE OF ABILENE · STEPHENS COUNTY REGULAR

RRC Lookup

Permits

2

Max Depth

2,100 ft

First Permit

1989-03-08

Latest Activity

1989-03-08

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1989-03-20

Shut-In

Plugged

1997-07-11

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: NEELEY, JUNE

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1997-11

Operator History

originally filed by NEELEY, JUNE — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#356705 A NEELEY, JUNE
received 1989-11-27
#356705 A NEELEY, JUNE
received 1989-03-06

Well Details

Well Number
88
Max Depth
2,100 ft
Drill Type
Vertical
County
STEPHENS
District
7
Completed
1989-03-20

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora