42-429-36459
Final CompletionBRP
STEPHENS County · District 7 · DOLBERRY ENERGY RESOURCES CORP. · BOWAR (CONGLOMERATE)
Permits
1
Max Depth
4,999 ft
First Permit
2008-06-23
Latest Activity
2008-06-23
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2008-08-16
Shut-In
—
Plugged
2010-09-21
!
EWA / Permit operator mismatch
Scheduling: DOLBERRY ENERGY RESOURCES CORP. ≠ Permit: DJD DRILLING CORPORATION
Resolved via: scheduling → DOLBERRY ENERGY RESOURCES CORP.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2008-08
Last Production
2011-01
Operator History
originally filed by DJD DRILLING CORPORATION — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#664427 A DJD DRILLING CORPORATION
received 2008-06-12
Well Details
- Well Number
- 1
- Max Depth
- 4,999 ft
- Drill Type
- Vertical
- County
- STEPHENS
- District
- 7
- Operator
- DOLBERRY ENERGY RESOURCES CORP.
- Completed
- 2008-08-16
Operator
- Location
- DALLAS
- P-5 Status
- Y (filed 2025-08-04)
- Cum Oil (all leases)
- 10,986 bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 5