42-431-31351

Final Completion

SOUDER

STERLING County · District 8 · TEMPO ENERGY INC. · CONGER SW (PENN)

RRC Lookup

Permits

1

Max Depth

8,650 ft

First Permit

1984-06-25

Latest Activity

1984-06-25

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-11-15

Shut-In

Plugged

2003-07-07

!

EWA / Permit operator mismatch

Scheduling: TEMPO ENERGY INC. ≠ Permit: JENNINGS ENERGY COMPANY

Resolved via: schedulingTEMPO ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2004-08

Operator History

originally filed by JENNINGS ENERGY COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#246704 A JENNINGS ENERGY COMPANY
received 1983-07-12

Well Details

Well Number
1
Max Depth
8,650 ft
Drill Type
Vertical
County
STERLING
District
8
Completed
1984-11-15

Operator

Location
MIDLAND
P-5 Status
Y (filed 2026-01-05)
Cum Oil (all leases)
180,292 bbl
Cum Gas (all leases)
— mcf
Total Permits
23

External Links

Live © 2026 Petrora