42-431-31584
Final CompletionELLWOOD
STERLING County · District 8 · TEMPO ENERGY INC. · SPADE (ELLENBURGER)
Permits
1
Max Depth
8,400 ft
First Permit
1984-12-31
Latest Activity
1984-12-31
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-03-13
Shut-In
—
Plugged
1986-01-21
!
EWA / Permit operator mismatch
Scheduling: TEMPO ENERGY INC. ≠ Permit: JUBILEE ENERGY CORPORATION
Resolved via: scheduling → TEMPO ENERGY INC.
Operator History
originally filed by JUBILEE ENERGY CORPORATION — asset transferred
Permit History (1)
Permit Applications (1)
#263545 A JUBILEE ENERGY CORPORATION
received 1984-12-28
Well Details
- Well Number
- 1
- Max Depth
- 8,400 ft
- Drill Type
- Vertical
- County
- STERLING
- District
- 8
- Operator
- TEMPO ENERGY INC.
- Completed
- 1985-03-13
Operator
- Name
- TEMPO ENGY, INC
- Location
- MIDLAND
- P-5 Status
- Y (filed 2026-01-05)
- Cum Oil (all leases)
- 180,292 bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 23