42-431-32175

Final Completion

KOHLER-ELLWOOD

STERLING County · District 8 · TRIO OPERATING COMPANY INC. · LONESOME DOVE (MISS)

RRC Lookup

Permits

1

Max Depth

8,300 ft

First Permit

1990-12-07

Latest Activity

1990-12-07

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1991-04-01

Shut-In

Plugged

1995-02-23

!

EWA / Permit operator mismatch

Scheduling: TRIO OPERATING COMPANY INC. ≠ Permit: KOHLER ENERGY CORPORATION

Resolved via: schedulingTRIO OPERATING COMPANY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1995-09

Operator History

originally filed by KOHLER ENERGY CORPORATION — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#381676 A KOHLER ENERGY CORPORATION
received 1990-11-29

Well Details

Well Number
1001A
Max Depth
8,300 ft
Drill Type
Vertical
County
STERLING
District
8
Completed
1991-04-01

Operator

Location
WICHITA FAL, LS
P-5 Status
Y (filed 2001-08-14)
Cum Oil (all leases)
1,569,425 bbl
Cum Gas (all leases)
408,179 mcf
Total Permits
203

External Links

Live © 2026 Petrora