42-433-31021

Final Completion

LONG ESTATE-KEGLER

STONEWALL County · District 7 · SMITH PIPE OF ABILENE · SHORT (CONGL. 5700)

RRC Lookup

Permits

1

Max Depth

5,900 ft

First Permit

1980-03-25

Latest Activity

1980-03-25

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-05-08

Shut-In

Plugged

1993-09-14

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: RAYMOND, WM. C. (reported 1993-07)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: JOHNSTON, E. C., COMPANY

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1993-10

Operator History

originally filed by JOHNSTON, E. C., COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#76164 A JOHNSTON, E. C., COMPANY
received 1980-03-25

Well Details

Well Number
1
Max Depth
5,900 ft
Drill Type
Vertical
County
STONEWALL
District
7
Completed
1980-05-08

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora