42-433-31603
Final CompletionPUMPHREY A
STONEWALL County · District 7 · SMITH PIPE OF ABILENE · ASHMORE (CONGLOMERATE)
Permits
1
Max Depth
6,150 ft
First Permit
1983-04-08
Latest Activity
1983-04-08
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-05-30
Shut-In
—
Plugged
1998-10-28
!
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: ODESSA EXPLORATION, INC. (reported 1996-06)
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: PERMIAN RESOURCES, INC.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1998-11
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#191022 A PERMIAN RESOURCES, INC.
received 1983-04-08
Well Details
- Well Number
- 1
- Max Depth
- 6,150 ft
- Drill Type
- Vertical
- County
- STONEWALL
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1983-05-30
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf