42-433-32273
INJECTIONMITCHELL JACK
STONEWALL County · District 7 · CLEAR FORK INCORPORATED · CLARENCE-MAY (TANNEHILL)
Permits
2
Max Depth
3,500 ft
First Permit
1987-08-17
Latest Activity
1987-08-17
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
2014-11-05
Shut-In
—
Plugged
—
P-5 Org Status: Active
EWA / Production operator mismatch
Scheduling: CLEAR FORK INCORPORATED ≠ Production: STAMPER OPERATING CO., INC. (reported 2007-05)
EWA / Permit operator mismatch
Scheduling: CLEAR FORK INCORPORATED ≠ Permit: STAMPER OPERATING CO., INC.
Resolved via: scheduling → CLEAR FORK INCORPORATED
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
originally filed by STAMPER OPERATING CO., INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
Well Details
- Well Number
- 1A
- Max Depth
- 3,500 ft
- Drill Type
- Vertical
- County
- STONEWALL
- District
- 7
- Operator
- CLEAR FORK INCORPORATED
- Completed
- 2014-11-05
Operator
- Name
- CLEAR FORK, INC
- Location
- ABILENE
- P-5 Status
- Y (filed 2025-12-04)
- Cum Oil (all leases)
- 18,244,679 bbl
- Cum Gas (all leases)
- 3,364,373 mcf
- Activities
- CSGD/P, G/PUR, OPRS/G, OPRS/O
- Total Permits
- 471